Serving the Greater Wilmington Area
    Cantilever Rack system in an industrial warehouse

    Cantilever Rack in Wilmington, NC

    Cantilever rack supports lumber, pipe and long building materials on projecting arms without front columns between loads. Suppliers planning storage in Leland, Hampstead and Holly Ridge need arm spacing and aisle turns based on their longest bundles, not a standard pallet footprint.

    The fast-growing coast creates demand for building materials, while coastal wind changes outdoor storage design. Outdoor cantilever serving US-17, Camp Davis Industrial Park or Belville must be engineered for coastal wind; humid, salt-air exposure also calls for a deliberate finish selection.

    (910) 597-4473

    Cantilever Rack Arms Sized for Long Loads

    1

    Bundle length

    Measure the shortest and longest loads. Column spacing and the number of supporting arms must suit both, with support points that limit material sag.

    2

    Weight per arm

    Determine how the heaviest bundle distributes its weight across the arms. Arm length, load placement and column capacity all affect the configuration.

    3

    Access from one or both sides

    Compare single-sided runs with double-sided rows. Include forklift approach and the full loaded turning envelope on each working side.

    Cantilever warehouse racking holding steel tubing
    Cantilever rack storing lumber and wood products

    Cantilever Warehouse Racking for Indoor and Outdoor Use

    Indoor rows follow clear height, columns and forklift reach. Pipe and lumber lengths can make turning space the limiting dimension even when there is room for more arms.

    Outdoor systems are engineered for coastal wind and the specified material arrangement. Discuss galvanized or protected finishes for humid and salt-air exposure; do not treat an indoor configuration as an outdoor specification.

    Cantilever Rack Layout and Yard Access

    Warehouse Consultations start with bundle lengths, weights, pick frequency and the truck or side loader. The drawing shows arm elevations, run lengths and turning space so individual bundles remain accessible.

    We coordinate experienced installation crews we schedule and manage. June–November hurricane season can affect deliveries and outdoor installation, so yard access and the work sequence are agreed during scheduling.

    Recent Installations

    A sample of racking projects completed across the region.

    Pallet rack installation project 1
    Pallet rack installation project 2
    Pallet rack installation project 3
    Pallet rack installation project 4
    Pallet rack installation project 5
    Pallet rack installation project 6
    Pallet rack installation project 7
    Pallet rack installation project 8
    Pallet rack installation project 9
    Pallet rack installation project 10

    Request a Layout for Lumber and Pipe

    Send the basics and we will come back with a layout and pricing. Prefer to talk? Call (910) 597-4473.

    What's Included:

    • Free warehouse consultation
    • CAD layout drawings
    • Itemized project quote
    • Rack type recommendations
    • Installation timeline

    We respect your privacy. Your information will never be shared.

    Cantilever Rack Planning Answers

    Where We Install Cantilever Rack

    Delivery and installation across the Cape Fear region and the I-40 and I-95 corridors.

    Other Rack Systems We Supply

    Where We Work

    Located in Wilmington, we serve the entire Cape Fear region with industrial pallet racks and warehouse storage solutions.

    Wilmington Pallet Rack

    Address

    1608 Queen St
    Unit F
    Wilmington, NC 28401

    Business Hours

    Monday - Friday: 8:00 AM - 6:00 PM
    Saturday: Closed
    Sunday: Closed

    Plan Arm Spacing Around Your Longest Loads

    Call (910) 597-4473 or request a quote and we will start a layout.

    (910) 597-4473
    Call Now